ProjectManagement

End-to-end engineering project management — from RFQ to delivery. We coordinate every phase of production so your components arrive on time, within spec, and within budget.

98%
On-Time Delivery
18+
Years Experience
500+
Projects Managed
ISO
9001:2015 Certified

Structured. Transparent. Accountable.

Every manufacturing project at GM Industries is assigned a dedicated project manager who acts as a single point of contact — from initial drawing review through final inspection and dispatch.

We follow structured APQP (Advanced Product Quality Planning) methodology adapted for precision manufacturing, ensuring risks are identified early and quality is built into every stage of production.

Start a Project ›
Dedicated project manager for every engagement
Feasibility review and DFM analysis before production
Detailed production schedules with milestone tracking
Real-time status updates and drawing revision control
Supplier and sub-contractor coordination
First Article Inspection (FAI) reports on request
PPAP documentation for automotive clients
Post-delivery support and repeat order management

Project Lifecycle

A structured, gate-based approach that keeps every project on track — from first enquiry to last delivery.

01
📄
Enquiry & Review

We review your drawings, 3D models, or samples. Our team assesses feasibility, material selection, tolerance requirements, and process routing within 4 business hours.

02
📈
Quotation & Planning

Detailed cost breakdown with material, machining, finishing, and tooling costs. We build a production schedule with committed delivery milestones.

03
⚙️
Process Setup

CNC programs, fixtures, jigs, and tooling are prepared. Process FMEAs are reviewed and control plans established before the first part is cut.

04
🔧
Pilot Production

First Article Inspection (FAI) confirms all dimensions and surface finishes meet specification before full-batch production begins. Customer approval obtained.

05
🔍
Quality Inspection

In-process and final inspection using CMM, surface roughness testers, and calibrated gauges. Full dimensional reports available on request.

06
🚚
Delivery & Closure

Packaging, dispatch, and delivery confirmation. Inspection certificates and material test reports (MTRs) accompany every shipment. Project review and lessons-learned documented.

Standards We Work To

Industry-proven quality frameworks applied to every project — from prototype to high-volume production.

Automotive
APQP / PPAP
Advanced Product Quality Planning and Production Part Approval Process documentation for Tier 1 and Tier 2 automotive suppliers. Covers all 5 PPAP levels.
Quality
FMEA & Control Plans
Process Failure Mode and Effects Analysis (PFMEA) and corresponding control plans to proactively identify and mitigate production risk before it reaches the shop floor.
Traceability
Lot Traceability
Material traceability from raw bar stock to finished component, including heat number tracking, material certificates (EN 10204), and process traveller documentation.
Scheduling
Production Scheduling
Machine-level scheduling with capacity planning, bottleneck identification, and dynamic adjustment for priority orders — keeping commitments even under production pressure.
Aerospace
AS9100 Alignment
Project documentation and risk management aligned with AS9100D requirements — first article records, revision control, and customer approval workflows built in.
Communication
Regular Reporting
Weekly status reports, drawing revision logs, and NCR (Non-Conformance Report) management. You always know where your project stands.

Typical Lead Times

We set realistic schedules and keep them. Below are standard lead times — urgent requirements can often be expedited.

Order TypeComplexityTypical Lead TimeNotes
Prototype / SampleSimple to Moderate3 – 7 working daysFAI included
Small Batch (1–50 pcs)Any7 – 14 working daysAfter drawing approval
Medium Batch (50–500 pcs)Standard14 – 21 working daysDepending on complexity
High Volume (>500 pcs)Standard21 – 35 working daysSchedule aligned with client
Urgent / ExpressSimple24 – 72 hoursSubject to capacity — contact us
Repeat OrdersAnyReduced by 20–30%Programs & fixtures retained

Let's Plan Your Next Project

Share your drawings or requirements — our project team will respond within 4 business hours with a plan and quote.

📧 Start a Project 💬 WhatsApp Us